Novarly ParcelRenewable sites

Renewable sitesSimpsons Malt Limited Biomass

Simpsons Malt Limited Biomass

Simpsons Malt Limited Biomass is under construction in Northumberland with a recorded capacity of 16 MW.

16 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Biomass (dedicated)
Technology
Simpsons Malt Limited
Northumberland
Authority
England

Planning and build timeline

Application submitted2023-06-05
Permission granted2023-09-26
4 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Barmoor South Wind Farm
Wind Onshore · Operational
13.813.7 km

How big is Simpsons Malt Limited Biomass?

Simpsons Malt Limited Biomass has a recorded installed capacity of 16 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Simpsons Malt Limited Biomass?

REPD records the operator as Simpsons Malt Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Simpsons Malt Limited Biomass approved and built?

The application was submitted on 2023-06-05. Permission was granted on 2023-09-26, 4 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14151.

Novarly Parcel · official public data, read properly · parcel.novarly.com