Nanthenfoel Farms is an operational 5 MW solar farm in Ceredigion, generating since 15 March 2017. Planning permission was granted on 18 November 2015, 4 months after submission. Operator of record: Anesco.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 15 March 2017
Solar Photovoltaics
Technology
Anesco
Ceredigion
Authority
Wales

Planning and build timeline

Application submitted27 July 2015
Permission granted18 November 2015
4 months after submission
Operational15 March 2017
16 months after consent

Screening a site of your own?

RedlineUK · £39

Ceredigion approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Nanthenfoel Farms’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Ceredigion’s record on solar

Ceredigion has decided 11 solar farms and approved 100%, taking a median of 6.4 months. See every solar farm decision in Ceredigion

Other built sites within 15 km

SiteMWDistance
Biomass (dedicated) · Operational
3.25.6 km

How big is Nanthenfoel Farms?

Nanthenfoel Farms has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Nanthenfoel Farms?

REPD records the operator as Anesco. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Nanthenfoel Farms approved and built?

The application was submitted on 27 July 2015. Permission was granted on 18 November 2015, 4 months later. The site became operational on 15 March 2017, 16 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5540.