Novarly ParcelRenewable sites

Renewable sitesMorayhill AD

Morayhill AD

Morayhill AD is an operational 2 MW anaerobic digestion plant in Highland, generating since 1 October 2017. Planning permission was granted on 27 October 2015, 2 months after submission. Operator of record: Morayhill.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 1 October 2017
Anaerobic Digestion
Technology
Morayhill
Highland
Authority
Scotland

Planning and build timeline

Application submitted26 August 2015
Permission granted27 October 2015
2 months after submission
Operational1 October 2017
23 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Highland: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Morayhill AD’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
6614.6 km

How big is Morayhill AD?

Morayhill AD has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Morayhill AD?

REPD records the operator as Morayhill. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Morayhill AD approved and built?

The application was submitted on 26 August 2015. Permission was granted on 27 October 2015, 2 months later. The site became operational on 1 October 2017, 23 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5703.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode