Renewable sites › Moel Maelogen A
Moel Maelogen A
Moel Maelogen A is an operational 2.6 MW onshore wind farm in Conwy, generating since 30 January 2003. Planning permission was granted on 15 December 1999, 4 months after submission. Operator of record: John Laing Environmental Assets Group.
Planning and build timeline
| Application submitted | 20 August 1999 |
| Permission granted | 15 December 1999 4 months after submission |
| Operational | 30 January 2003 38 months after consent |
Screening a site of your own?
Conwy approves 57% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Moel Maelogen A’s recorded coordinate — swap in your own postcode or coordinates.
Conwy’s record on onshore wind
Conwy has decided 7 onshore wind schemes and approved 57%, taking a median of 6.3 months. See every onshore wind scheme decision in Conwy →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 11.7 | 0 km |
Large Hydro · Operational | 32 | 10 km |
How big is Moel Maelogen A?
Moel Maelogen A has a recorded installed capacity of 2.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Moel Maelogen A?
REPD records the operator as John Laing Environmental Assets Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Moel Maelogen A approved and built?
The application was submitted on 20 August 1999. Permission was granted on 15 December 1999, 4 months later. The site became operational on 30 January 2003, 38 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2653.