Renewable sites › Llangwyryfon
Llangwyryfon
Llangwyryfon is an operational 9.4 MW onshore wind farm in Ceredigion, generating since 1 February 2004. Planning permission was granted on 1 March 2003, 15 months after submission. Operator of record: Westbury Windfarms.
Planning and build timeline
| Application submitted | 1 December 2001 |
| Permission granted | 1 March 2003 15 months after submission |
| Operational | 1 February 2004 11 months after consent |
Screening a site of your own?
Ceredigion approves 83% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Llangwyryfon’s recorded coordinate — swap in your own postcode or coordinates.
Ceredigion’s record on onshore wind
Ceredigion has decided 6 onshore wind schemes and approved 83%, taking a median of 14.9 months. See every onshore wind scheme decision in Ceredigion →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 2.5 | 13.4 km |
How big is Llangwyryfon?
Llangwyryfon has a recorded installed capacity of 9.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Llangwyryfon?
REPD records the operator as Westbury Windfarms. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Llangwyryfon approved and built?
The application was submitted on 1 December 2001. Permission was granted on 1 March 2003, 15 months later. The site became operational on 1 February 2004, 11 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3229.