Novarly ParcelRenewable sites

Renewable sitesLairg

Lairg

Lairg is operational in Highland with a recorded capacity of 3.5 MW, and has been generating since 1959-01-01.

3.5 MW
Capacity
as recorded in REPD
Operational
Status
since 1959-01-01
Small Hydro
Technology
Scottish and Southern Energy (SSE)
Highland
Authority
Scotland

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1959-01-01

Other built sites within 15 km

SiteMWDistance
Lairg Wind Farm
Wind Onshore · Operational
7.54.8 km
Lairg 2 Wind Farm
Wind Onshore · Under Construction
49.95 km
Achany Wind Farm
Wind Onshore · Operational
385.9 km
Rosehall Hill Forest Windfarm
Wind Onshore · Operational
24.78.6 km
Cassley
Large Hydro · Operational
1011.5 km

How big is Lairg?

Lairg has a recorded installed capacity of 3.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lairg?

REPD records the operator as Scottish and Southern Energy (SSE). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lairg approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1959-01-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 470.