Novarly ParcelRenewable sites

Renewable sitesIsle of Muck Microgrid System

Isle of Muck Microgrid System

Isle of Muck Microgrid System is an operational battery storage site in Highland, generating since 12 November 2013. REPD does not record the planning grant date. Operator of record: Wind & Sun.

Capacity
as recorded in REPD
Operational
Status
since 12 November 2013
Battery
Technology
Wind & Sun
Highland
Authority
Scotland

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational12 November 2013

Screening a site of your own?

RedlineUK · £39

Highland approves 85% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Isle of Muck Microgrid System’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Highland’s record on battery storage

Highland has decided 34 battery storage schemes and approved 85%, taking a median of 12.6 months. See every battery storage scheme decision in Highland

Other built sites within 15 km

SiteMWDistance
Battery · Operational
0.19.2 km

How big is Isle of Muck Microgrid System?

REPD does not record an installed capacity for Isle of Muck Microgrid System.

Who operates Isle of Muck Microgrid System?

REPD records the operator as Wind & Sun. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Isle of Muck Microgrid System approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 12 November 2013.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6853.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode