Novarly ParcelRenewable sites

Renewable sitesHuntingfield Solar Farm

Huntingfield Solar Farm

Huntingfield Solar Farm is an operational 4.4 MW solar farm in Breckland, generating since 15 July 2018. Planning permission was granted on 22 September 2015, 3 months after submission. Operator of record: Raker Farms.

4.4 MW
Capacity
as recorded in REPD
Operational
Status
since 15 July 2018
Solar Photovoltaics
Technology
Raker Farms
Breckland
Authority
England

Planning and build timeline

Application submitted18 June 2015
Permission granted22 September 2015
3 months after submission
Operational15 July 2018
34 months after consent

Screening a site of your own?

RedlineUK · £39

Breckland approves 93% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Huntingfield Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Breckland’s record on solar

Breckland has decided 27 solar farms and approved 93%, taking a median of 2.7 months. See every solar farm decision in Breckland

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
48 km
Wind Onshore · Operational
14.48 km
Solar Photovoltaics · Operational
0.28.1 km
Solar Photovoltaics · Operational
0.349.9 km
Wind Onshore · Operational
1.810.1 km
Landfill Gas · Operational
110.3 km
Wind Onshore · Operational
1.511.3 km
Solar Photovoltaics · Operational
7.912.4 km

How big is Huntingfield Solar Farm?

Huntingfield Solar Farm has a recorded installed capacity of 4.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Huntingfield Solar Farm?

REPD records the operator as Raker Farms. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Huntingfield Solar Farm approved and built?

The application was submitted on 18 June 2015. Permission was granted on 22 September 2015, 3 months later. The site became operational on 15 July 2018, 34 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5265.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode