Novarly ParcelRenewable sites

Renewable sitesHadley Farm (Orta Membury Solar Farm)

Hadley Farm (Orta Membury Solar Farm)

Hadley Farm (Orta Membury Solar Farm) is an operational 17 MW solar farm in West Berkshire, generating since 26 March 2015. Planning permission was granted on 27 May 2014, 3 months after submission. Operator of record: Foresight Solar.

17 MW
Capacity
as recorded in REPD
Operational
Status
since 26 March 2015
Solar Photovoltaics
Technology
Foresight Solar
West Berkshire
Authority
England

Planning and build timeline

Application submitted21 February 2014
Permission granted27 May 2014
3 months after submission
Operational26 March 2015
10 months after consent

Screening a site of your own?

RedlineUK · £39

West Berkshire approves 95% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Hadley Farm (Orta Membury Solar Farm)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

West Berkshire’s record on solar

West Berkshire has decided 22 solar farms and approved 95%, taking a median of 2.8 months. See every solar farm decision in West Berkshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
77.3 km

How big is Hadley Farm (Orta Membury Solar Farm)?

Hadley Farm (Orta Membury Solar Farm) has a recorded installed capacity of 17 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hadley Farm (Orta Membury Solar Farm)?

REPD records the operator as Foresight Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hadley Farm (Orta Membury Solar Farm) approved and built?

The application was submitted on 21 February 2014. Permission was granted on 27 May 2014, 3 months later. The site became operational on 26 March 2015, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1920.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode