Novarly ParcelRenewable sites

Renewable sitesGortahurk Road

Gortahurk Road

Gortahurk Road is an operational 1.5 MW anaerobic digestion plant in Fermanagh and Omagh, generating since 30 March 2018. Planning permission was granted on 16 March 2017, 3 months after submission. Operator of record: Connective Energy Holdings.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 30 March 2018
Anaerobic Digestion
Technology
Connective Energy Holdings
Fermanagh and Omagh
Authority
Northern Ireland

Planning and build timeline

Application submitted1 December 2016
Permission granted16 March 2017
3 months after submission
Operational30 March 2018
12 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Fermanagh and Omagh: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Gortahurk Road’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
56.6 km
Wind Onshore · Operational
546.6 km
Wind Onshore · Operational
156.7 km
Biomass (dedicated) · Operational
2.512.7 km
Wind Onshore · Operational
1113.1 km

How big is Gortahurk Road?

Gortahurk Road has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Gortahurk Road?

REPD records the operator as Connective Energy Holdings. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Gortahurk Road approved and built?

The application was submitted on 1 December 2016. Permission was granted on 16 March 2017, 3 months later. The site became operational on 30 March 2018, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6280.