Renewable sitesBalcas Timber Biomass CHP Plant

Balcas Timber Biomass CHP Plant

Balcas Timber Biomass CHP Plant is an operational 2.5 MW biomass plant in Fermanagh and Omagh, generating since 14 November 2005. Planning permission was granted on 1 June 2004, 12 months after submission. Operator of record: Balcas Timber.

2.5 MW
Capacity
as recorded in REPD
Operational
Status
since 14 November 2005
Biomass (dedicated)
Technology
Balcas Timber
Fermanagh and Omagh
Authority
Northern Ireland

Planning and build timeline

Application submitted1 June 2003
Permission granted1 June 2004
12 months after submission
Operational14 November 2005
17 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Fermanagh and Omagh: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Balcas Timber Biomass CHP Plant’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
1512.3 km
Anaerobic Digestion · Operational
1.512.7 km
Wind Onshore · Operational
513.2 km
Wind Onshore · Operational
5413.2 km

How big is Balcas Timber Biomass CHP Plant?

Balcas Timber Biomass CHP Plant has a recorded installed capacity of 2.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Balcas Timber Biomass CHP Plant?

REPD records the operator as Balcas Timber. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Balcas Timber Biomass CHP Plant approved and built?

The application was submitted on 1 June 2003. Permission was granted on 1 June 2004, 12 months later. The site became operational on 14 November 2005, 17 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 33.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode