Renewable sites › Garreg Lwyd
Garreg Lwyd
Garreg Lwyd is an operational 34 MW onshore wind farm in Powys, generating since 22 February 2017. Planning permission was granted on 14 May 2015, 84 months after submission. Operator of record: Renewables Infrastructure Group (TRIG).
Planning and build timeline
| Application submitted | 27 May 2008 |
| Permission granted | 14 May 2015 84 months after submission |
| Operational | 22 February 2017 21 months after consent |
Screening a site of your own?
Powys approves 68% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Garreg Lwyd’s recorded coordinate — swap in your own postcode or coordinates.
Powys’s record on onshore wind
Powys has decided 22 onshore wind schemes and approved 68%, taking a median of 36.8 months. See every onshore wind scheme decision in Powys →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 31 | 10.5 km |
How big is Garreg Lwyd?
Garreg Lwyd has a recorded installed capacity of 34 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Garreg Lwyd?
REPD records the operator as Renewables Infrastructure Group (TRIG). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Garreg Lwyd approved and built?
The application was submitted on 27 May 2008. Permission was granted on 14 May 2015, 84 months later. The site became operational on 22 February 2017, 21 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3711.