Garreg Lwyd
Garreg Lwyd is operational in Powys with a recorded capacity of 34 MW, and has been generating since 2017-02-22.
Planning and build timeline
| Application submitted | 2008-05-27 |
| Permission granted | 2015-05-14 84 months after submission |
| Operational | 2017-02-22 21 months after consent |
Powys’s record on onshore wind
Powys has decided 22 onshore wind schemes and approved 68%, taking a median of 36.8 months. See every onshore wind scheme decision in Powys →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Llandinam Windfarm Wind Onshore · Operational | 31 | 10.5 km |
How big is Garreg Lwyd?
Garreg Lwyd has a recorded installed capacity of 34 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Garreg Lwyd?
REPD records the operator as Renewables Infrastructure Group (TRIG). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Garreg Lwyd approved and built?
The application was submitted on 2008-05-27. Permission was granted on 2015-05-14, 84 months later. The site became operational on 2017-02-22, 21 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3711.