Eye Biomass Plant

Eye Biomass Plant is an operational 14.3 MW biomass plant in Mid Suffolk, generating since 1 July 1992. REPD does not record the planning grant date. Operator of record: South Western Power (NOVERA).

14.3 MW
Capacity
as recorded in REPD
Operational
Status
since 1 July 1992
Biomass (dedicated)
Technology
South Western Power (NOVERA)
Mid Suffolk
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1 July 1992

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Mid Suffolk: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Eye Biomass Plant’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
50.4 km
Solar Photovoltaics · Operational
0.74.5 km
Solar Photovoltaics · Operational
814.5 km

How big is Eye Biomass Plant?

Eye Biomass Plant has a recorded installed capacity of 14.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Eye Biomass Plant?

REPD records the operator as South Western Power (NOVERA). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Eye Biomass Plant approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1 July 1992.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 82.