Renewable sites › Eye Biomass Plant
Eye Biomass Plant
Eye Biomass Plant is operational in Mid Suffolk with a recorded capacity of 14.3 MW, and has been generating since 1992-07-01.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 1992-07-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Humphrey Group Wind Onshore · Operational | 5 | 0.4 km |
Victoria Road - Solar Photovoltaic System Solar Photovoltaics · Operational | 0.7 | 4.5 km |
Kenninghall Solar / Hazeldick Solar Solar Photovoltaics · Operational | 8 | 14.5 km |
How big is Eye Biomass Plant?
Eye Biomass Plant has a recorded installed capacity of 14.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Eye Biomass Plant?
REPD records the operator as South Western Power (NOVERA). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Eye Biomass Plant approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1992-07-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 82.
Novarly Parcel · official public data, read properly · parcel.novarly.com