Renewable sites › Edinbane Wind Farm
Edinbane Wind Farm
Edinbane Wind Farm is an operational 41.4 MW onshore wind farm in Highland, generating since 21 June 2010. Planning permission was granted on 16 May 2007, 63 months after submission. Operator of record: Vattenfall.
Planning and build timeline
| Application submitted | 28 February 2002 |
| Permission granted | 16 May 2007 63 months after submission |
| Operational | 21 June 2010 37 months after consent |
Screening a site of your own?
Highland approves 63% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Edinbane Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.
Highland’s record on onshore wind
Highland has decided 99 onshore wind schemes and approved 63%, taking a median of 13.9 months. See every onshore wind scheme decision in Highland →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 23 | 4.7 km |
Wind Onshore · Operational | 4.6 | 4.7 km |
How big is Edinbane Wind Farm?
Edinbane Wind Farm has a recorded installed capacity of 41.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Edinbane Wind Farm?
REPD records the operator as Vattenfall. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Edinbane Wind Farm approved and built?
The application was submitted on 28 February 2002. Permission was granted on 16 May 2007, 63 months later. The site became operational on 21 June 2010, 37 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4674.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode