Ben Aketil is an operational 23 MW onshore wind farm in Highland, generating since 1 September 2007. Planning permission was granted on 5 September 2005, 36 months after submission. Operator of record: RDC Scotland (Renewable Development Co.).

23 MW
Capacity
as recorded in REPD
Operational
Status
since 1 September 2007
Wind Onshore
Technology
RDC Scotland (Renewable Development Co.)
Highland
Authority
Scotland

Planning and build timeline

Application submitted30 August 2002
Permission granted5 September 2005
36 months after submission
Operational1 September 2007
24 months after consent

Screening a site of your own?

RedlineUK · £39

Highland approves 63% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Ben Aketil’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Highland’s record on onshore wind

Highland has decided 99 onshore wind schemes and approved 63%, taking a median of 13.9 months. See every onshore wind scheme decision in Highland

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
4.60 km
Wind Onshore · Operational
41.44.7 km

How big is Ben Aketil?

Ben Aketil has a recorded installed capacity of 23 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ben Aketil?

REPD records the operator as RDC Scotland (Renewable Development Co.). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ben Aketil approved and built?

The application was submitted on 30 August 2002. Permission was granted on 5 September 2005, 36 months later. The site became operational on 1 September 2007, 24 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3135.