East Anglia 3 (EA 3) is under construction in England with a recorded capacity of 1.40 GW.
Planning and build timeline
| Application submitted | 2015-11-18 |
| Permission granted | 2017-08-07 21 months after submission |
| Operational | not recorded |
What this site sits on
- Special Area of Conservation — Southern North Sea
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
East Anglia 1 (EA 1) Wind Offshore · Operational | 714 | 0 km |
How big is East Anglia 3 (EA 3)?
East Anglia 3 (EA 3) has a recorded installed capacity of 1.40 GW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates East Anglia 3 (EA 3)?
REPD records the operator as Scottish Power Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was East Anglia 3 (EA 3) approved and built?
The application was submitted on 2015-11-18. Permission was granted on 2017-08-07, 21 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2470.