East Anglia 1 (EA 1)
East Anglia 1 (EA 1) is an operational 714 MW offshore wind farm in England, generating since 28 July 2020. Planning permission was granted on 17 June 2014, 19 months after submission. Operator of record: Scottish Power Renewables.
Planning and build timeline
| Application submitted | 21 November 2012 |
| Permission granted | 17 June 2014 19 months after submission |
| Operational | 28 July 2020 73 months after consent |
Screening a site of your own?
Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with East Anglia 1 (EA 1)’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
- Special Area of Conservation — Southern North Sea
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Offshore · Under Construction | 1400 | 0 km |
How big is East Anglia 1 (EA 1)?
East Anglia 1 (EA 1) has a recorded installed capacity of 714 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates East Anglia 1 (EA 1)?
REPD records the operator as Scottish Power Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was East Anglia 1 (EA 1) approved and built?
The application was submitted on 21 November 2012. Permission was granted on 17 June 2014, 19 months later. The site became operational on 28 July 2020, 73 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2524.