Creag Riabhach Wind Farm

Creag Riabhach Wind Farm is an operational 92.4 MW onshore wind farm in Scotland, generating since 12 January 2023. Planning permission was granted on 17 October 2016, 33 months after submission. Operator of record: ERG.

92.4 MW
Capacity
as recorded in REPD
Operational
Status
since 12 January 2023
Wind Onshore
Technology
ERG
National
Authority
Scotland

Planning and build timeline

Application submitted3 January 2014
Permission granted17 October 2016
33 months after submission
Operational12 January 2023
75 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Creag Riabhach Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Scottish Government (S36)’s record on onshore wind

Scottish Government (S36) has decided 173 onshore wind schemes and approved 80%, taking a median of 33.7 months. See every onshore wind scheme decision in Scottish Government (S36)

How big is Creag Riabhach Wind Farm?

Creag Riabhach Wind Farm has a recorded installed capacity of 92.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Creag Riabhach Wind Farm?

REPD records the operator as ERG. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Creag Riabhach Wind Farm approved and built?

The application was submitted on 3 January 2014. Permission was granted on 17 October 2016, 33 months later. The site became operational on 12 January 2023, 75 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4300.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode