Novarly ParcelRenewable sites

Renewable sitesBV Dairy (Farm AD)

BV Dairy (Farm AD)

BV Dairy (Farm AD) is operational in Dorset with a recorded capacity of 1.5 MW, and has been generating since 2011-01-05.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2011-01-05
Anaerobic Digestion
Technology
BV Dairy
Dorset
Authority
England

Planning and build timeline

Application submitted2009-05-27
Permission granted2009-07-28
2 months after submission
Operational2011-01-05
17 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Land east of Littledown Business Park
Solar Photovoltaics · Operational
6.21 km
Hawkers Hill Energy Park
Battery · Operational
202.1 km
Brickfields Business Park, Unit 17 - Solar panels
Solar Photovoltaics · Under Construction
0.626.7 km
Brickfields Business Park, Unit 24 - Solar panels
Solar Photovoltaics · Under Construction
0.166.7 km
Brickfields Business Park, Unit 16 - Solar Panels
Solar Photovoltaics · Under Construction
0.176.7 km
Brickfields Business Park, Unit 35 - Solar Panels
Solar Photovoltaics · Under Construction
0.336.7 km
Slaughtergate Farm
Solar Photovoltaics · Operational
1.89.8 km
Park Farm
Solar Photovoltaics · Operational
410 km

How big is BV Dairy (Farm AD)?

BV Dairy (Farm AD) has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates BV Dairy (Farm AD)?

REPD records the operator as BV Dairy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was BV Dairy (Farm AD) approved and built?

The application was submitted on 2009-05-27. Permission was granted on 2009-07-28, 2 months later. The site became operational on 2011-01-05, 17 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 214.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council