Novarly ParcelRenewable sites

Renewable sitesBrickfields Business Park, Unit 24 - Solar panels

Brickfields Business Park, Unit 24 - Solar panels

Brickfields Business Park, Unit 24 - Solar panels is a 0.16 MW solar farm under construction in Dorset. Planning permission was granted on 12 May 2023, 7 months after submission. Operator of record: Dextra Lighting Systems Plc.

0.16 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Dextra Lighting Systems Plc
Dorset
Authority
England

Planning and build timeline

Application submitted10 October 2022
Permission granted12 May 2023
7 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Dorset approves 95% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Brickfields Business Park, Unit 24 - Solar panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Dorset’s record on solar

Dorset has decided 97 solar farms and approved 95%, taking a median of 3.7 months. See every solar farm decision in Dorset

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
0.620 km
Solar Photovoltaics · Under Construction
0.330 km
Solar Photovoltaics · Under Construction
0.170 km
Solar Photovoltaics · Operational
1.83.2 km
Solar Photovoltaics · Operational
54.1 km
Battery · Operational
204.6 km
Solar Photovoltaics · Operational
56 km
Solar Photovoltaics · Operational
6.26 km

How big is Brickfields Business Park, Unit 24 - Solar panels?

Brickfields Business Park, Unit 24 - Solar panels has a recorded installed capacity of 0.16 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Brickfields Business Park, Unit 24 - Solar panels?

REPD records the operator as Dextra Lighting Systems Plc. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Brickfields Business Park, Unit 24 - Solar panels approved and built?

The application was submitted on 10 October 2022. Permission was granted on 12 May 2023, 7 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12398.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode