Burton Bradstock Solar Panels

Burton Bradstock Solar Panels is under construction in Dorset.

Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Geoffrey Joy
Dorset
Authority
England

Planning and build timeline

Application submitted2020-10-21
Permission granted2021-01-06
3 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Dorset’s record on solar

Dorset has decided 97 solar farms and approved 95%, taking a median of 3.7 months. See every solar farm decision in Dorset

Other built sites within 15 km

SiteMWDistance
Rampisham North
Solar Photovoltaics · Operational
513.5 km

How big is Burton Bradstock Solar Panels?

REPD does not record an installed capacity for Burton Bradstock Solar Panels.

Who operates Burton Bradstock Solar Panels?

REPD records the operator as Geoffrey Joy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Burton Bradstock Solar Panels approved and built?

The application was submitted on 2020-10-21. Permission was granted on 2021-01-06, 3 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8230.