Braich Ddu is an operational 3.9 MW onshore wind farm in Gwynedd, generating since 31 August 2007. Planning permission was granted on 13 September 2004, 6 months after submission. Operator of record: REG Windpower (previously Cornwall Light and Power).
Planning and build timeline
| Application submitted | 11 March 2004 |
| Permission granted | 13 September 2004 6 months after submission |
| Operational | 31 August 2007 36 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Gwynedd: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Braich Ddu’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 2.8 | 9.4 km |
Wind Onshore · Operational | 10.2 | 14.4 km |
How big is Braich Ddu?
Braich Ddu has a recorded installed capacity of 3.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Braich Ddu?
REPD records the operator as REG Windpower (previously Cornwall Light and Power). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Braich Ddu approved and built?
The application was submitted on 11 March 2004. Permission was granted on 13 September 2004, 6 months later. The site became operational on 31 August 2007, 36 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4022.