Novarly ParcelRenewable sites

Renewable sitesBiggin Hill Airport, Main Road - Solar PV Array

Biggin Hill Airport, Main Road - Solar PV Array

Biggin Hill Airport, Main Road - Solar PV Array is under construction in Bromley with a recorded capacity of 12 MW.

12 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
LXi REIT
Bromley
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Bromley’s record on solar

Bromley has decided 7 solar farms and approved 100%, taking a median of 2.2 months. See every solar farm decision in Bromley

Other built sites within 15 km

SiteMWDistance
Beddington EfW
EfW Incineration · Operational
2613.4 km

How big is Biggin Hill Airport, Main Road - Solar PV Array?

Biggin Hill Airport, Main Road - Solar PV Array has a recorded installed capacity of 12 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Biggin Hill Airport, Main Road - Solar PV Array?

REPD records the operator as LXi REIT. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Biggin Hill Airport, Main Road - Solar PV Array approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 15451.