Novarly ParcelRenewable sites

Renewable sitesBells Of Lazonby, Edenholme Bakery - Solar Panels

Bells Of Lazonby, Edenholme Bakery - Solar Panels

Bells Of Lazonby, Edenholme Bakery - Solar Panels is operational in Westmorland and Furness with a recorded capacity of 0.63 MW, and has been generating since 2023-03-01.

0.63 MW
Capacity
as recorded in REPD
Operational
Status
since 2023-03-01
Solar Photovoltaics
Technology
Bells of Lazonby
Westmorland and Furness
Authority
England

Planning and build timeline

Application submitted2022-09-21
Permission granted2022-11-14
2 months after submission
Operational2023-03-01
4 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Westmorland and Furness’s record on solar

Westmorland and Furness has decided 39 solar farms and approved 85%, taking a median of 3.8 months. See every solar farm decision in Westmorland and Furness

Other built sites within 15 km

SiteMWDistance
Moss Thorn Farm
Solar Photovoltaics · Operational
5.811 km
Land at Wreay
Solar Photovoltaics · Operational
514.6 km

How big is Bells Of Lazonby, Edenholme Bakery - Solar Panels?

Bells Of Lazonby, Edenholme Bakery - Solar Panels has a recorded installed capacity of 0.63 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bells Of Lazonby, Edenholme Bakery - Solar Panels?

REPD records the operator as Bells of Lazonby. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bells Of Lazonby, Edenholme Bakery - Solar Panels approved and built?

The application was submitted on 2022-09-21. Permission was granted on 2022-11-14, 2 months later. The site became operational on 2023-03-01, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12314.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council