Beck Burn

Beck Burn is operational in Cumberland with a recorded capacity of 31 MW, and has been generating since 2017-04-26.

31 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-04-26
Wind Onshore
Technology
EDF Energy Renewables
Cumberland
Authority
England

Planning and build timeline

Application submitted2013-11-08
Permission granted2015-04-30
18 months after submission
Operational2017-04-26
24 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cumberland’s record on onshore wind

Cumberland has decided 38 onshore wind schemes and approved 66%, taking a median of 10.3 months. See every onshore wind scheme decision in Cumberland

Other built sites within 15 km

SiteMWDistance
Hallburn Farm
Wind Onshore · Operational
13.27.1 km
Kingmoor Park
Solar Photovoltaics · Operational
59.6 km
Solwaybank Wind Farm
Wind Onshore · Operational
3011.2 km

How big is Beck Burn?

Beck Burn has a recorded installed capacity of 31 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Beck Burn?

REPD records the operator as EDF Energy Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Beck Burn approved and built?

The application was submitted on 2013-11-08. Permission was granted on 2015-04-30, 18 months later. The site became operational on 2017-04-26, 24 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4544.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council