Renewable sites › Barff Lane - Farm Anaerobic Digestion Plant
Barff Lane - Farm Anaerobic Digestion Plant
Barff Lane - Farm Anaerobic Digestion Plant is an anaerobic digestion plant under construction in West Lindsey. Planning permission was granted on 28 April 2022, 1 months after submission. Operator of record: Glentham Farming Company.
Planning and build timeline
| Application submitted | 12 April 2022 |
| Permission granted | 28 April 2022 1 months after submission |
| Operational | not recorded |
Screening a site of your own?
Redline runs the record on your own boundary in West Lindsey: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Barff Lane - Farm Anaerobic Digestion Plant’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Anaerobic Digestion · Operational | 1.1 | 8.3 km |
How big is Barff Lane - Farm Anaerobic Digestion Plant?
REPD does not record an installed capacity for Barff Lane - Farm Anaerobic Digestion Plant.
Who operates Barff Lane - Farm Anaerobic Digestion Plant?
REPD records the operator as Glentham Farming Company. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Barff Lane - Farm Anaerobic Digestion Plant approved and built?
The application was submitted on 12 April 2022. Permission was granted on 28 April 2022, 1 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11238.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode