Novarly ParcelRenewable sites

Renewable sitesAllt Fionn - resubmission

Allt Fionn - resubmission

Allt Fionn - resubmission is an operational 2.1 MW hydro scheme in Scotland, generating since 27 July 2012. Planning permission was granted on 24 April 2010, 9 months after submission. Operator of record: Osspower.

2.1 MW
Capacity
as recorded in REPD
Operational
Status
since 27 July 2012
Small Hydro
Technology
Osspower
National
Authority
Scotland

Planning and build timeline

Application submitted21 July 2009
Permission granted24 April 2010
9 months after submission
Operational27 July 2012
27 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Allt Fionn - resubmission’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Small Hydro · Operational
1.32.4 km
Small Hydro · Operational
213.8 km

How big is Allt Fionn - resubmission?

Allt Fionn - resubmission has a recorded installed capacity of 2.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Allt Fionn - resubmission?

REPD records the operator as Osspower. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Allt Fionn - resubmission approved and built?

The application was submitted on 21 July 2009. Permission was granted on 24 April 2010, 9 months later. The site became operational on 27 July 2012, 27 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 473.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode