Allt Dearg Wind Farmers LLP
Allt Dearg Wind Farmers LLP is an operational 10.8 MW onshore wind farm in Argyll and Bute, generating since 25 September 2012. Planning permission was granted on 5 April 2011, 3 months after submission. Operator of record: Ormsary and Stronachullin Estates (Allt Dearg Wind Farmers LLP).
Planning and build timeline
| Application submitted | 17 January 2011 |
| Permission granted | 5 April 2011 3 months after submission |
| Operational | 25 September 2012 18 months after consent |
Screening a site of your own?
Argyll and Bute approves 58% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Allt Dearg Wind Farmers LLP’s recorded coordinate — swap in your own postcode or coordinates.
Argyll and Bute’s record on onshore wind
Argyll and Bute has decided 38 onshore wind schemes and approved 58%, taking a median of 14.7 months. See every onshore wind scheme decision in Argyll and Bute →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 6 | 0.2 km |
Small Hydro · Operational | 0.2 | 13.1 km |
How big is Allt Dearg Wind Farmers LLP?
Allt Dearg Wind Farmers LLP has a recorded installed capacity of 10.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Allt Dearg Wind Farmers LLP?
REPD records the operator as Ormsary and Stronachullin Estates (Allt Dearg Wind Farmers LLP). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Allt Dearg Wind Farmers LLP approved and built?
The application was submitted on 17 January 2011. Permission was granted on 5 April 2011, 3 months later. The site became operational on 25 September 2012, 18 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3758.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode