Novarly ParcelRenewable planning

Renewable planning SolarWirral

Solar planning in Wirral

Wirral has decided 7 solar farms and approved 100% of them, taking a median of 1.8 months to decide. Consented capacity: 3 MW. 2 applications still awaiting a decision.

100%
Approved
7 granted · 0 refused
1.8 mo
Median decision
UK 2.3 mo
3 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (7 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Wirral compares

Against the 298 UK authorities with 5+ solar decisions, Wirral sits in the 77th percentile for approval rate (7 points above the England average) and the 74th percentile for speed.

Decisions by year

35Approved — 3 (2023)323Approved — 4 (2025)425
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (9)

SchemeMWStatusDecided
Tesco Pharmacy, Bidston - Solar Panels
Batchelor Electrical Limited · SPVX/26/00242
0.23Application Submitted2026-02-17
Sainsburys, Woodchurch Road - Solar Panels
Sainsburys Supermarkets Limited · SPVX/26/00223
0.16Application Submitted2026-02-13
Woodchurch High School, Carr Bridge Road - Solar Panels
Located Property Limited · SPVX/25/01466 · 1.8 mo to decide
0.49Awaiting Construction2025-11-12
St Marys College, Wallasey Village - Solar Panels
St Marys Catholic College · SPVX/25/01138 · 2.3 mo to decide
0.31Awaiting Construction2025-09-16
Woodchurch High School, Carr Bridge Road - Solar Panels
Woodchurch High School · SPVX/25/01137 · 1.8 mo to decide
0.34Awaiting Construction2025-09-15
Tesco, Bidston Link Road, Bidston - Solar Panels
Tesco Stores Limited · SPVX/25/01089 · 1.9 mo to decide
0.3Awaiting Construction2025-09-12
Valley Road, Bidston - Solar Panels
Balfour Beatty Construction Limited · SPVX/23/01084 · 1.7 mo to decide
0.17Awaiting Construction2023-09-04
Murrayfield Hospital, Holmwood Drive - Solar Panels
Spire Healthcare Limited · APP/22/01665 · 4.7 mo to decide
0.17Awaiting Construction2023-06-19
Tipographic, Morpeth Wharf - Solar PV Panels
GGRS Energie Limited · SPVX/23/00275 · 1.7 mo to decide
0.81Awaiting Construction2023-05-22

Does Wirral approve solar farms?

Yes — of the 7 solar farms Wirral has decided, 100% were approved (7 granted, 0 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a solar farm application take in Wirral?

The median time from application to decision is 1.8 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Wirral consented?

3 MW has been consented across 7 approved schemes. A further 2 applications awaits a decision.

Other technologies in Wirral

Battery storage in WirralOnshore wind in Wirral

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com