Renewable planning › Solar › Stirling
Solar planning in Stirling
Stirling has decided 7 solar farms and approved 100% of them, taking a median of 1.8 months to decide. Consented capacity: 25 MW.
⚠️ Small caseload (7 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.
How Stirling compares
Against the 298 UK authorities with 5+ solar decisions, Stirling sits in the 77th percentile for approval rate (7 points above the England average) and the 74th percentile for speed.
Decisions by year
Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.
Every recorded scheme (8)
| Scheme | MW | Status | Decided |
|---|---|---|---|
McLaren Leisure Centre - Solar Panels McLaren Community Leisure Centre · 2025/0344/DET · 1.8 mo to decide | 0.22 | Awaiting Construction | 2026-02-02 |
Pirnhall Services, Bannockburn Interchange - Solar Panels Moto Hospitality Limited (Head Office) · 24/00361/FUL · 11.7 mo to decide | 4 | Awaiting Construction | 2025-05-20 |
University Of Stirling, Airthrey Road - Solar PV Panels University of Stirling · 24/00391/FUL · 1.8 mo to decide | 0.35 | Awaiting Construction | 2024-08-12 |
Cottrell Building, East Link Road - Solar PV Panels University of Stirling · 24/00390/FUL · 1.8 mo to decide | 0.48 | Awaiting Construction | 2024-08-12 |
Airthrey Road - PV Solar Panels Stirling Council · 21/01032/FUL · 2.2 mo to decide | — | Awaiting Construction | 2022-02-18 |
Patrickston Farm Green Energy International · 19/00915/FUL · 3.3 mo to decide | 15 | Planning Permission Expired | 2020-05-05 |
Manor Powis Stirling Council · 16/00503/FUL | 5 | Application Withdrawn | 2017-07-03 |
Farm at Lower Polmaise Stirling Council · 15/00492/FUL · 1.1 mo to decide | 5 | Planning Permission Expired | 2015-10-08 |
Does Stirling approve solar farms?
Yes — of the 7 solar farms Stirling has decided, 100% were approved (7 granted, 0 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.
How long does a solar farm application take in Stirling?
The median time from application to decision is 1.8 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much solar capacity has Stirling consented?
25 MW has been consented across 7 approved schemes. There are no applications currently awaiting a decision.
Other technologies in Stirling
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.