Battery storage planning in Stirling

Stirling has decided 4 battery storage schemes and approved 100% of them, taking a median of 4.3 months to decide. Consented capacity: 104 MW. 1 application still awaiting a decision.

100%
Approved
4 granted · 0 refused
4.3 mo
Median decision
UK 6 mo
104 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (4 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Stirling compares

Against the 137 UK authorities with 5+ battery storage decisions, Stirling sits in the 73rd percentile for approval rate (8 points above the England average) and the 71st percentile for speed.

Decisions by year

35Approved — 2 (2021)221Approved — 1 (2024)124Approved — 1 (2025)125
Approved Refused

Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (7)

SchemeMWStatusDecided
Killin Switching Station, Boreland - Boreland Energy Storage Park
Boreland Energy Limited · 25/00246/FUL · 4.3 mo to decide
43Awaiting Construction2025-09-08
Acharn Forest - Battery Storage
Biomass Energy Renewables Llp · 2023/0372/DET · 2.3 mo to decide
9.9Awaiting Construction2024-01-10
Bolfornought Farm
Intelligent Land Investments · 21/00293/FUL · 9.5 mo to decide
49.9Application Withdrawn2022-01-28
Forthside Way - Battery Storage Unit
Stirling Council · 21/00957/PPP · 1.2 mo to decide
1Awaiting Construction2021-12-22
Shindour - Energy Storage Facility
Gigabox Developments Limited · 21/00756/FLM · 7.1 mo to decide
49.9Awaiting Construction2021-12-16
Bolfornought Farm Battery Storage Facility
Intelligent Land Investments Group · 21/00293/FUL
49.9Application Submitted2021-04-14
Unit 15, Borrowmeadow Road
Flexible Grid Power · 17/00665/FUL
19Abandoned2017-08-22

Does Stirling approve battery storage schemes?

Yes — of the 4 battery storage schemes Stirling has decided, 100% were approved (4 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Stirling?

The median time from application to decision is 4.3 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has Stirling consented?

104 MW has been consented across 4 approved schemes. A further 1 application awaits a decision.

Other technologies in Stirling

Solar in StirlingOnshore wind in Stirling

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.