Solar planning in Southampton

Southampton has decided 13 solar farms and approved 92% of them, taking a median of 1.7 months to decide. Consented capacity: 3 MW. 1 application still awaiting a decision.

92%
Approved
12 granted · 1 refused
1.7 mo
Median decision
UK 2.3 mo
3 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

How Southampton compares

Against the 298 UK authorities with 5+ solar decisions, Southampton sits in the 31st percentile for approval rate (1 points below the England average) and the 87th percentile for speed.

Decisions by year

35Approved — 1 (2021)Refused — 1 (2021)221Approved — 2 (2022)222Approved — 2 (2023)223Approved — 3 (2024)324Approved — 4 (2025)425
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (14)

SchemeMWStatusDecided
Antelope Retail Park, Bursledon Road - Solar Photovoltaic Panels
Antelope Retail Park · 26/00206/PAPV
0.67Application Submitted2026-02-25
West Quay Retail Park, Harbour Parade - Solar Panels
Aviva Life & Pensions UK Limited · 25/01346/PAPV · 1.4 mo to decide
Awaiting Construction2025-12-03
Harbour Parade - Solar Photovoltaics
Southampton · 25/00807/PAPV · 1.1 mo to decide
Awaiting Construction2025-07-23
Grosvenor House & Belmont House, Portswood Road - Solar Panels
Nanopro-Tech · 25/00191/PAPV · 1.8 mo to decide
0.16Awaiting Construction2025-04-08
Airways Distribution Park, Wide Lane, Unit 1 - Solar Panels
Ineco Energy Limited · 24/01511/PAPV · 1.8 mo to decide
0.45Awaiting Construction2025-01-28
Spire Hospital, Chalybeate Close - Solar Panels
Spire Healthcare · 24/00264/PAPV · 2.5 mo to decide
0.23Awaiting Construction2024-05-23
Southampton General Hospital, Tremona Road - Solar Panels
3Ti Energy Hubs Limited · 23/01629/FUL · 1.8 mo to decide
0.25Awaiting Construction2024-02-09
Asquith Nursery, David Lloyd Leisure - Solar Panels
Centrica Business Solutions Head Office · 23/01519/PAPV · 1.3 mo to decide
0.3Awaiting Construction2024-01-30
Airways Distribution Park, Wide Lane - Solar Panels
Columbia Threadneedle · 23/00572/PAPV · 1.7 mo to decide
0.34Awaiting Construction2023-06-20
Buildings J K And Z Tesla Centre, Herbert Walker Avenue - Solar Panels
Associated British Ports · 22/01584/PAPV · 1.6 mo to decide
0.84Awaiting Construction2023-01-06
Test Valley Business Centre, Test Lane - Solar PV system
MC Truck & Bus Limited · 22/02702/REJS · 0.8 mo to decide
0.33Awaiting Construction2022-11-11
Lucia Foster Welch Student Hall Of Residence - Solar Panels
Boudicca One Limited · 22/01040/FUL · 2.3 mo to decide
Awaiting Construction2022-09-27
Saxon House, Lower York Street - Solar Photovoltaic Panels
MDL Marinas · 21/00401/PAPV · 1.8 mo to decide
Awaiting Construction2021-05-07
Shamrock Quay - Solar Photovoltaic Equipment
MDL Marinas · 21/00402/PAPV · 1.7 mo to decide
Application Refused2021-04-30

Does Southampton approve solar farms?

Yes — of the 13 solar farms Southampton has decided, 92% were approved (12 granted, 1 refused). The UK-wide rate for solar is 93%.

How long does a solar farm application take in Southampton?

The median time from application to decision is 1.7 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Southampton consented?

3 MW has been consented across 12 approved schemes. A further 1 application awaits a decision.

Other technologies in Southampton

Battery storage in SouthamptonOnshore wind in Southampton

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.