Renewable planning › Battery storage › Southampton
Battery storage planning in Southampton
Southampton has decided 2 battery storage schemes and approved 50% of them, taking a median of 14.4 months to decide. Consented capacity: 99 MW.
⚠️ Small caseload (2 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.
How Southampton compares
Against the 137 UK authorities with 5+ battery storage decisions, Southampton sits in the 1st percentile for approval rate (42 points below the England average) and the 4th percentile for speed.
Decisions by year
Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.
Every recorded scheme (2)
| Scheme | MW | Status | Decided |
|---|---|---|---|
Weston Lane - Battery Storage Facility Anglo Renewables Limited · 23/03055/FULLS · 18.4 mo to decide | 49.9 | Application Refused | 2025-06-12 |
Butts Field, Mill Lane - Battery Storage Ecotricity Generation Limited · 23/02942/FULLS · 10.3 mo to decide | 99 | Awaiting Construction | 2024-10-03 |
Does Southampton approve battery storage schemes?
Yes — of the 2 battery storage schemes Southampton has decided, 50% were approved (1 granted, 1 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.
How long does a battery storage scheme application take in Southampton?
The median time from application to decision is 14.4 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much battery storage capacity has Southampton consented?
99 MW has been consented across 1 approved scheme, with 50 MW refused. There are no applications currently awaiting a decision.
Other technologies in Southampton
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.