Renewable planning › Solar › Nuneaton and Bedworth
Solar planning in Nuneaton and Bedworth
Nuneaton and Bedworth has decided 6 solar farms and approved 67% of them, taking a median of 1.7 months to decide. Consented capacity: 2 MW. 2 applications still awaiting a decision.
⚠️ Small caseload (6 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.
How Nuneaton and Bedworth compares
Against the 298 UK authorities with 5+ solar decisions, Nuneaton and Bedworth sits in the 2nd percentile for approval rate (26 points below the England average) and the 87th percentile for speed.
Decisions by year
Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.
Every recorded scheme (8)
| Scheme | MW | Status | Decided |
|---|---|---|---|
George eliot high school, Raveloe Drive - Solar Panels George Eliot Academy · 41323 · 1.7 mo to decide | 0.29 | Awaiting Construction | 2025-12-08 |
Brose, Colliery Lane North - Solar Panels Brose (UK) Limited · 40564 · 1.6 mo to decide | 0.59 | Application Refused | 2024-11-27 |
Newgate Coolliery - Solar Farm & Battery Storage Sirius Environmental Limited · 40290 | 6 | Application Submitted | 2024-05-10 |
North Warwickshire College, Hinckley Road - Solar Panel North Warwickshire South Leicestershire College · 39754 · 1.8 mo to decide | 0.29 | Awaiting Construction | 2023-09-18 |
Bedworth Lane, Coolliery Wood - Solar Farm & Battery Storage Sirius Environmental Limited · 39547 | — | Revised | 2023-07-24 |
Hamilton Way, Unit 12 - Solar Array Prologis Uk · 39520 · 1.2 mo to decide | 0.7 | Awaiting Construction | 2023-04-27 |
Unit 1, Mallory Way, Longford - Solar Panels Legal & General Invt Management · 39113 · 3.3 mo to decide | 0.3 | Application Refused | 2022-11-10 |
St Georges Way - Solar photovoltaics Goodman · 38737 · 1.7 mo to decide | 0.61 | Awaiting Construction | 2022-05-06 |
Does Nuneaton and Bedworth approve solar farms?
Yes — of the 6 solar farms Nuneaton and Bedworth has decided, 67% were approved (4 granted, 2 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.
How long does a solar farm application take in Nuneaton and Bedworth?
The median time from application to decision is 1.7 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much solar capacity has Nuneaton and Bedworth consented?
2 MW has been consented across 4 approved schemes, with 1 MW refused. A further 2 applications awaits a decision.
Other technologies in Nuneaton and Bedworth
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.
Novarly Parcel · official public data, read properly · parcel.novarly.com