Renewable planning › Battery storage › Nuneaton and Bedworth
Battery storage planning in Nuneaton and Bedworth
Nuneaton and Bedworth has decided 1 battery storage scheme and approved 100% of them, taking a median of 4 months to decide. Consented capacity: 30 MW. 3 applications still awaiting a decision.
⚠️ Small caseload (1 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.
How Nuneaton and Bedworth compares
Against the 137 UK authorities with 5+ battery storage decisions, Nuneaton and Bedworth sits in the 73rd percentile for approval rate (8 points above the England average) and the 73rd percentile for speed.
Every recorded scheme (4)
| Scheme | MW | Status | Decided |
|---|---|---|---|
Mcdonnell Drive, Exhall - Battery Energy Storage System Greenfield Energy Developments Limited · 41030 · 4 mo to decide | 30 | Awaiting Construction | 2025-10-10 |
Weddington Road - Battery Energy Storage Fig Power · 40498 | 49.9 | Application Submitted | 2024-08-29 |
Newgate Coolliery - Solar Farm & Battery Storage Sirius Environmental Limited · 40290 | 5 | Application Submitted | 2024-05-10 |
Bedworth Lane, Coolliery Wood - Solar Farm & Battery Storage Sirius Environmental Limited · 39547 | 5 | Revised | 2023-07-24 |
Does Nuneaton and Bedworth approve battery storage schemes?
Yes — of the 1 battery storage schemes Nuneaton and Bedworth has decided, 100% were approved (1 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.
How long does a battery storage scheme application take in Nuneaton and Bedworth?
The median time from application to decision is 4 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much battery storage capacity has Nuneaton and Bedworth consented?
30 MW has been consented across 1 approved scheme. A further 3 applications awaits a decision.
Other technologies in Nuneaton and Bedworth
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.