Battery storage planning in Nuneaton and Bedworth

Nuneaton and Bedworth has decided 1 battery storage scheme and approved 100% of them, taking a median of 4 months to decide. Consented capacity: 30 MW. 3 applications still awaiting a decision.

100%
Approved
1 granted · 0 refused
4 mo
Median decision
UK 6 mo
30 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (1 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Nuneaton and Bedworth compares

Against the 137 UK authorities with 5+ battery storage decisions, Nuneaton and Bedworth sits in the 73rd percentile for approval rate (8 points above the England average) and the 73rd percentile for speed.

Every recorded scheme (4)

SchemeMWStatusDecided
Mcdonnell Drive, Exhall - Battery Energy Storage System
Greenfield Energy Developments Limited · 41030 · 4 mo to decide
30Awaiting Construction2025-10-10
Weddington Road - Battery Energy Storage
Fig Power · 40498
49.9Application Submitted2024-08-29
Newgate Coolliery - Solar Farm & Battery Storage
Sirius Environmental Limited · 40290
5Application Submitted2024-05-10
Bedworth Lane, Coolliery Wood - Solar Farm & Battery Storage
Sirius Environmental Limited · 39547
5Revised2023-07-24

Does Nuneaton and Bedworth approve battery storage schemes?

Yes — of the 1 battery storage schemes Nuneaton and Bedworth has decided, 100% were approved (1 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Nuneaton and Bedworth?

The median time from application to decision is 4 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has Nuneaton and Bedworth consented?

30 MW has been consented across 1 approved scheme. A further 3 applications awaits a decision.

Other technologies in Nuneaton and Bedworth

Solar in Nuneaton and BedworthOnshore wind in Nuneaton and Bedworth

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com

Screen a specific site here · All authorities · UK property report