Solar planning in Falkirk

Falkirk has decided 8 solar farms and approved 100% of them, taking a median of 1.7 months to decide. Consented capacity: 2 MW.

100%
Approved
8 granted · 0 refused
1.7 mo
Median decision
UK 2.3 mo
2 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

How Falkirk compares

Against the 298 UK authorities with 5+ solar decisions, Falkirk sits in the 77th percentile for approval rate (7 points above the England average) and the 87th percentile for speed.

Decisions by year

35Approved — 3 (2022)322Approved — 2 (2023)223Approved — 2 (2024)224Approved — 1 (2025)125
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (9)

SchemeMWStatusDecided
Central Boulevard, Central Park - Solar Panels
Ameresco Limited · P/25/0070/CPL · 1.2 mo to decide
Awaiting Construction2025-04-04
Whyte and Mackay - Solar Panels
Whyte & Mackay Distillers Limited · P/24/0360/FUL · 1.9 mo to decide
0.25Awaiting Construction2024-10-18
Wonder World, Castlelaurie Industrial Estate - Solar Panels
SNRG Limited · P/24/0060/FUL · 1.2 mo to decide
0.21Awaiting Construction2024-03-22
North Inches - Solar Photovoltaic Electricity Generation
Private Developer · P/22/0135/PPP
Application Withdrawn2023-11-20
Forth Valley Royal Hospital, Stirling Road - Solar Array
Forth Health Limited · P/23/0329/FUL · 1.1 mo to decide
0.21Awaiting Construction2023-08-04
West Carron Works, Stenhouse Road - Solar Array
Carron Phoenix · P/23/0171/FUL · 2.1 mo to decide
0.55Awaiting Construction2023-06-16
Denny Wastewater Treatment, Winchester Avenue - Solar Panels
Scottish Water Horizons · P/22/0396/FUL · 3.2 mo to decide
0.44Awaiting Construction2022-11-18
Roughmute Sewage Treatment Works - Solar Panels
Scottish Water National Operations Control Centre · P/22/0436/FUL · 1.8 mo to decide
0.81Awaiting Construction2022-11-04
Campbells Prime Meat, The Heatherfield Whitecross - Solar Panels
Campbells Prime Meat · P/22/0394/FUL · 1.6 mo to decide
Awaiting Construction2022-10-07

Does Falkirk approve solar farms?

Yes — of the 8 solar farms Falkirk has decided, 100% were approved (8 granted, 0 refused). The UK-wide rate for solar is 93%.

How long does a solar farm application take in Falkirk?

The median time from application to decision is 1.7 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Falkirk consented?

2 MW has been consented across 8 approved schemes. There are no applications currently awaiting a decision.

Other technologies in Falkirk

Battery storage in FalkirkOnshore wind in Falkirk

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.