Solar planning in East Renfrewshire

East Renfrewshire has decided 2 solar farms and approved 100% of them, taking a median of 1.5 months to decide. Consented capacity: 1 MW. 1 application still awaiting a decision.

100%
Approved
2 granted · 0 refused
1.5 mo
Median decision
UK 2.3 mo
1 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (2 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How East Renfrewshire compares

Against the 298 UK authorities with 5+ solar decisions, East Renfrewshire sits in the 77th percentile for approval rate (7 points above the England average) and the 95th percentile for speed.

Decisions by year

35Approved — 1 (2023)123Approved — 1 (2025)125
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (3)

SchemeMWStatusDecided
Bonnyton, Kirkton Moor Road - Solar PV Panels
Advance Construction(Scotland) Limited · 2025/0405/TP
28Application Submitted2025-07-11
Linn Products, Glasgow Road - Solar Panels
Linn Products Limited · 2025/0034/TP · 0.9 mo to decide
0.5Awaiting Construction2025-03-10
David Lloyd Leisure Health Club, Stewarton Road - Solar panels
David Lloyd Leisure Limited · 2023/0517/TP · 2.1 mo to decide
0.46Awaiting Construction2023-12-22

Does East Renfrewshire approve solar farms?

Yes — of the 2 solar farms East Renfrewshire has decided, 100% were approved (2 granted, 0 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a solar farm application take in East Renfrewshire?

The median time from application to decision is 1.5 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has East Renfrewshire consented?

1 MW has been consented across 2 approved schemes. A further 1 application awaits a decision.

Other technologies in East Renfrewshire

Battery storage in East RenfrewshireOnshore wind in East Renfrewshire

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.