Solar planning in East Ayrshire

East Ayrshire has decided 6 solar farms and approved 100% of them, taking a median of 2.6 months to decide. Consented capacity: 1 MW.

100%
Approved
6 granted · 0 refused
2.6 mo
Median decision
UK 2.3 mo
1 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (6 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How East Ayrshire compares

Against the 298 UK authorities with 5+ solar decisions, East Ayrshire sits in the 77th percentile for approval rate (7 points above the England average) and the 44th percentile for speed.

Decisions by year

35Approved — 2 (2021)221Approved — 3 (2023)323Approved — 1 (2025)125
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (6)

SchemeMWStatusDecided
Aldi Foodstore, Rigg Street - Solar Panels
Aldi Stores Limited · 25/0071/LDPU · 1.7 mo to decide
Awaiting Construction2025-04-15
Kilmarnock Academy, Elmbank Drive - Solar PV System
Centrestage Communities Limited · 23/0533/PP · 1.6 mo to decide
0.18Awaiting Construction2023-11-24
Cummnock Waste Water Treatment Works - Solar Panels
Scottish Water Horizons · 23/0105/PP · 3.4 mo to decide
0.46Awaiting Construction2023-06-27
Auldhouseburn Farm, Muirkirk - Solar Panels
HA Blackwood Limited · 22/0711/PP · 3.8 mo to decide
0.2Awaiting Construction2023-05-15
Elmbank Drive Solar Panels
Centrestage Communities Limited · 21/0054/PP · 6.7 mo to decide
Operational2021-08-20
Moorfield North Industrial Park, Moorfield
Brahead Foods · 21/0017/PP · 1.4 mo to decide
Awaiting Construction2021-03-02

Does East Ayrshire approve solar farms?

Yes — of the 6 solar farms East Ayrshire has decided, 100% were approved (6 granted, 0 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a solar farm application take in East Ayrshire?

The median time from application to decision is 2.6 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has East Ayrshire consented?

1 MW has been consented across 6 approved schemes. There are no applications currently awaiting a decision.

Other technologies in East Ayrshire

Battery storage in East AyrshireOnshore wind in East Ayrshire

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.