Battery storage planning in East Ayrshire

East Ayrshire has decided 5 battery storage schemes and approved 100% of them, taking a median of 15.2 months to decide. Consented capacity: 155 MW. 2 applications still awaiting a decision.

100%
Approved
5 granted · 0 refused
15.2 mo
Median decision
UK 6 mo
155 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (5 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How East Ayrshire compares

Against the 137 UK authorities with 5+ battery storage decisions, East Ayrshire sits in the 73rd percentile for approval rate (8 points above the England average) and the 4th percentile for speed.

Decisions by year

35Approved — 1 (2022)122Approved — 1 (2023)123Approved — 1 (2024)124Approved — 2 (2025)225
Approved Refused

Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (7)

SchemeMWStatusDecided
Enoch Hill, Dalmellington - Battery Storage
RWE Renewables Uk Limited · 23/0469/PP · 22.4 mo to decide
11Awaiting Construction2025-07-17
Breezy Hill, North Kyle Forest Estate - BESS
Brockwell Energy Limited · ECU00005060
40Application Submitted2025-05-08
Electricity Substation, Bardarroch - Battery Energy Storage
Balance Power Projects Limited · 23/0604/PP · 15.2 mo to decide
29.9Awaiting Construction2025-03-04
Coylton Substation, Coylton - Battery Energy Storage
Statkraft UK Limited · 23/0580/PP · 3.9 mo to decide
50Under Construction2024-02-29
Killoch Depot, Killoch Colliery - Battery Storage
Brockwell Energy Limited · 22/0405/PP · 6 mo to decide
49.9Awaiting Construction2023-03-30
Hare Craig Windfarm
EnergieKontor UK · 20/0001/PP · 29.3 mo to decide
13.9Awaiting Construction2022-07-12
Ochiltree - Battery Sorage
Statkraft UK Limited · 21/0748/PP
19.9Revised2021-11-22

Does East Ayrshire approve battery storage schemes?

Yes — of the 5 battery storage schemes East Ayrshire has decided, 100% were approved (5 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in East Ayrshire?

The median time from application to decision is 15.2 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has East Ayrshire consented?

155 MW has been consented across 5 approved schemes. A further 2 applications awaits a decision.

Other technologies in East Ayrshire

Solar in East AyrshireOnshore wind in East Ayrshire

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.