Battery storage planning in Colchester
Colchester has decided 5 battery storage schemes and approved 100% of them, taking a median of 5.6 months to decide. Consented capacity: 7 MW.
⚠️ Small caseload (5 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.
How Colchester compares
Against the 137 UK authorities with 5+ battery storage decisions, Colchester sits in the 73rd percentile for approval rate (8 points above the England average) and the 53rd percentile for speed.
Decisions by year
Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.
Every recorded scheme (5)
| Scheme | MW | Status | Decided |
|---|---|---|---|
Via Urbis Romanae, Whitmore Drive - Micro Energy Storage AMP Clean Energy · 251005 · 7.3 mo to decide | 0.2 | Awaiting Construction | 2025-12-23 |
Telford Way, Stephenson Road - Micro Energy Battery Storage AMP Clean Energy · 232193 · 1.8 mo to decide | 0.2 | Awaiting Construction | 2023-11-10 |
Birch Solar Farm & Battery Storage Low Carbon Solar Park 22 Limited · 222151 · 6.9 mo to decide | — | Operational | 2023-03-20 |
Grange Box, Grange Way - Battery Storage AMP Clean Energy · 222430 · 1.8 mo to decide | 0.2 | Awaiting Construction | 2022-11-17 |
Stephenson Road - Urban Reserve Flexible Energy Facility AMP Energy Services LImited · 221033 · 5.6 mo to decide | 6 | Awaiting Construction | 2022-10-28 |
Does Colchester approve battery storage schemes?
Yes — of the 5 battery storage schemes Colchester has decided, 100% were approved (5 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.
How long does a battery storage scheme application take in Colchester?
The median time from application to decision is 5.6 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much battery storage capacity has Colchester consented?
7 MW has been consented across 5 approved schemes. There are no applications currently awaiting a decision.
Other technologies in Colchester
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.
Novarly Parcel · official public data, read properly · parcel.novarly.com
Screen a specific site here · All authorities · UK property report