Solar planning in Argyll and Bute

Argyll and Bute has decided 4 solar farms and approved 100% of them, taking a median of 3.4 months to decide. Consented capacity: 3 MW. 2 applications still awaiting a decision.

100%
Approved
4 granted · 0 refused
3.4 mo
Median decision
UK 2.3 mo
3 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (4 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Argyll and Bute compares

Against the 298 UK authorities with 5+ solar decisions, Argyll and Bute sits in the 77th percentile for approval rate (7 points above the England average) and the 23rd percentile for speed.

Decisions by year

35Approved — 3 (2024)324Approved — 1 (2025)125
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (6)

SchemeMWStatusDecided
Marys Land, Tayvallich - Ground Mounted Solar Panels
Tayvallich Initiative · 26/00352/PP
0.3Application Submitted2026-03-27
Ionad Iomairt Thiriodh, Crossapol - Solar Panels
Tiree Community Development Trust · 25/01801/PP · 1.4 mo to decide
0.15Awaiting Construction2025-12-17
Cnocbreac Inver Estate - Solar Generation
Inver Hydro Limited · 24/01390/PP · 2.7 mo to decide
2.1Under Construction2024-10-28
Rothesay Waste Water Treatment - Solar Panels
Scottish Water National Operations Control Centre · 24/00329/PP · 6.2 mo to decide
0.26Awaiting Construction2024-08-29
Helensburgh Waste Water Treatment Works, Moss Road - Solar Panels
Scottish Water Horizons · 24/01320/PP
0.21Application Submitted2024-08-01
Glenegedale Lotts, Turbine Lotts - Solar Pv Array
Islay Energy Trust · 24/00218/PP · 4 mo to decide
0.22Awaiting Construction2024-06-20

Does Argyll and Bute approve solar farms?

Yes — of the 4 solar farms Argyll and Bute has decided, 100% were approved (4 granted, 0 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a solar farm application take in Argyll and Bute?

The median time from application to decision is 3.4 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Argyll and Bute consented?

3 MW has been consented across 4 approved schemes. A further 2 applications awaits a decision.

Other technologies in Argyll and Bute

Battery storage in Argyll and ButeOnshore wind in Argyll and Bute

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.