Onshore wind planning in Stratford-on-Avon

Stratford-on-Avon has decided 1 onshore wind scheme and approved 0% of them, taking a median of 10.3 months to decide.

0%
Approved
0 granted · 1 refused
10.3 mo
Median decision
UK 11.5 mo
0 MW
Consented
15 MW refused
1
Appeals
0 allowed on appeal

⚠️ Small caseload (1 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Stratford-on-Avon compares

Against the 75 UK authorities with 5+ onshore wind decisions, Stratford-on-Avon sits in the 0th percentile for approval rate (68 points below the England average) and the 73rd percentile for speed.

Every recorded scheme (2)

SchemeMWStatusDecided
Stoneton Wind Farm
EDF Energy Renewables · 12/01500/FUL
18Application Withdrawn2014-05-09
Starbold Wind Farm
Broadview Energy · 12/00330/FUL · 10.3 mo to decide
15Appeal Refused2013-02-13

Does Stratford-on-Avon approve onshore wind schemes?

Yes — of the 1 onshore wind schemes Stratford-on-Avon has decided, 0% were approved (0 granted, 1 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a onshore wind scheme application take in Stratford-on-Avon?

The median time from application to decision is 10.3 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much onshore wind capacity has Stratford-on-Avon consented?

0 MW has been consented across 0 approved schemes, with 15 MW refused. There are no applications currently awaiting a decision.

Other technologies in Stratford-on-Avon

Solar in Stratford-on-AvonBattery storage in Stratford-on-Avon

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.