Onshore wind planning in North East Lincolnshire

North East Lincolnshire has decided 1 onshore wind scheme and approved 100% of them, taking a median of 18.9 months to decide. Consented capacity: 4 MW. 2 applications still awaiting a decision.

100%
Approved
1 granted · 0 refused
18.9 mo
Median decision
UK 11.5 mo
4 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (1 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How North East Lincolnshire compares

Against the 75 UK authorities with 5+ onshore wind decisions, North East Lincolnshire sits in the 98th percentile for approval rate (32 points above the England average) and the 22nd percentile for speed.

Every recorded scheme (4)

SchemeMWStatusDecided
Port Of Immingham West Riverside, Immingham Docks - Wind Turbines
Associated British Ports · PA/2024/397 · 18.9 mo to decide
4.2Awaiting Construction2025-12-19
Port Of Immingham West Riverside, Immingham Docks - Wind Turbines
Associated British Ports · DM/0329/24/FUL
4.2Application Submitted2024-04-16
Estuary Way - Wind Turbine
Associated British Ports (ABP) · DM/0311/24/FUL
Application Submitted2024-04-16
Stallingborough Wind farm
Aeolian Stallingborough Ltd · DC/827/08/IMM
6Application Withdrawn2012-08-13

Does North East Lincolnshire approve onshore wind schemes?

Yes — of the 1 onshore wind schemes North East Lincolnshire has decided, 100% were approved (1 granted, 0 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a onshore wind scheme application take in North East Lincolnshire?

The median time from application to decision is 18.9 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much onshore wind capacity has North East Lincolnshire consented?

4 MW has been consented across 1 approved scheme. A further 2 applications awaits a decision.

Other technologies in North East Lincolnshire

Solar in North East LincolnshireBattery storage in North East Lincolnshire

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com

Screen a specific site here · All authorities · UK property report