Renewable planning › Onshore wind › North East Lincolnshire
Onshore wind planning in North East Lincolnshire
North East Lincolnshire has decided 1 onshore wind scheme and approved 100% of them, taking a median of 18.9 months to decide. Consented capacity: 4 MW. 2 applications still awaiting a decision.
⚠️ Small caseload (1 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.
How North East Lincolnshire compares
Against the 75 UK authorities with 5+ onshore wind decisions, North East Lincolnshire sits in the 98th percentile for approval rate (32 points above the England average) and the 22nd percentile for speed.
Every recorded scheme (4)
| Scheme | MW | Status | Decided |
|---|---|---|---|
Port Of Immingham West Riverside, Immingham Docks - Wind Turbines Associated British Ports · PA/2024/397 · 18.9 mo to decide | 4.2 | Awaiting Construction | 2025-12-19 |
Port Of Immingham West Riverside, Immingham Docks - Wind Turbines Associated British Ports · DM/0329/24/FUL | 4.2 | Application Submitted | 2024-04-16 |
Estuary Way - Wind Turbine Associated British Ports (ABP) · DM/0311/24/FUL | — | Application Submitted | 2024-04-16 |
Stallingborough Wind farm Aeolian Stallingborough Ltd · DC/827/08/IMM | 6 | Application Withdrawn | 2012-08-13 |
Does North East Lincolnshire approve onshore wind schemes?
Yes — of the 1 onshore wind schemes North East Lincolnshire has decided, 100% were approved (1 granted, 0 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.
How long does a onshore wind scheme application take in North East Lincolnshire?
The median time from application to decision is 18.9 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much onshore wind capacity has North East Lincolnshire consented?
4 MW has been consented across 1 approved scheme. A further 2 applications awaits a decision.
Other technologies in North East Lincolnshire
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.