Renewable planning Onshore windNewport

Onshore wind planning in Newport

Newport has decided 4 onshore wind schemes and approved 100% of them, taking a median of 2.5 months to decide. Consented capacity: 13 MW. 1 application still awaiting a decision.

100%
Approved
4 granted · 0 refused
2.5 mo
Median decision
UK 11.5 mo
13 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (4 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Newport compares

Against the 75 UK authorities with 5+ onshore wind decisions, Newport sits in the 98th percentile for approval rate (32 points above the England average) and the 100th percentile for speed.

Decisions by year

35Approved — 1 (2012)112Approved — 1 (2015)115
Approved Refused

Onshore wind decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (5)

SchemeMWStatusDecided
North Court Farm, Redwick - Wind Turbine
Clean Earth Energy Limited · DM/2023/01045
3.5Application Submitted2023-07-24
Longlands Farm, Rush Wall Lane
Clean Earth (CE) · 18/0408
3.5Operational2018-05-03
ANP Newport Wind Turbine
Associated British Ports · 15/0839 · 2.2 mo to decide
2.3Operational2015-09-30
Nash Waste Water Treatment Works Turbine
Welsh Water · 11/1287 · 6.9 mo to decide
2.5Operational2012-07-04
Solutia UK Ltd
Solutia / Vestas · 08/1412 · 2.5 mo to decide
5Operational2009-01-19

Does Newport approve onshore wind schemes?

Yes — of the 4 onshore wind schemes Newport has decided, 100% were approved (4 granted, 0 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a onshore wind scheme application take in Newport?

The median time from application to decision is 2.5 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much onshore wind capacity has Newport consented?

13 MW has been consented across 4 approved schemes. A further 1 application awaits a decision.

Other technologies in Newport

Solar in NewportBattery storage in Newport

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com