Onshore wind planning in Mid Devon

Mid Devon has decided 1 onshore wind scheme and approved 0% of them, taking a median of 26.2 months to decide.

0%
Approved
0 granted · 1 refused
26.2 mo
Median decision
UK 11.5 mo
0 MW
Consented
12 MW refused
1
Appeals
0 allowed on appeal

⚠️ Small caseload (1 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Mid Devon compares

Against the 75 UK authorities with 5+ onshore wind decisions, Mid Devon sits in the 0th percentile for approval rate (68 points below the UK average) and the 8th percentile for speed.

Screening a site of your own?

RedlineUK · £39

Mid Devon approves 0% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site£39
Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Every recorded scheme (2)

SchemeMWStatusDecided
Bickham Moor Wind Farm
Coronation Power Limited · 07/02262/MFUL · 26.2 mo to decide
12Appeal Refused2010-01-29
Nine Ash Cross
The Huntsham Estate · 4/52/2002/2879
4.1Application Withdrawn2003-09-02

Does Mid Devon approve onshore wind schemes?

Yes — of the 1 onshore wind schemes Mid Devon has decided, 0% were approved (0 granted, 1 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a onshore wind scheme application take in Mid Devon?

The median time from application to decision is 26.2 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much onshore wind capacity has Mid Devon consented?

0 MW has been consented across 0 approved schemes, with 12 MW refused. There are no applications currently awaiting a decision.

Other technologies in Mid Devon

Solar in Mid DevonBattery storage in Mid Devon

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com