Renewable planning › Onshore wind › Mid Devon
Onshore wind planning in Mid Devon
Mid Devon has decided 1 onshore wind scheme and approved 0% of them, taking a median of 26.2 months to decide.
⚠️ Small caseload (1 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.
How Mid Devon compares
Against the 75 UK authorities with 5+ onshore wind decisions, Mid Devon sits in the 0th percentile for approval rate (68 points below the England average) and the 8th percentile for speed.
Every recorded scheme (2)
| Scheme | MW | Status | Decided |
|---|---|---|---|
Bickham Moor Wind Farm Coronation Power Limited · 07/02262/MFUL · 26.2 mo to decide | 12 | Appeal Refused | 2010-01-29 |
Nine Ash Cross The Huntsham Estate · 4/52/2002/2879 | 4.1 | Application Withdrawn | 2003-09-02 |
Does Mid Devon approve onshore wind schemes?
Yes — of the 1 onshore wind schemes Mid Devon has decided, 0% were approved (0 granted, 1 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.
How long does a onshore wind scheme application take in Mid Devon?
The median time from application to decision is 26.2 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much onshore wind capacity has Mid Devon consented?
0 MW has been consented across 0 approved schemes, with 12 MW refused. There are no applications currently awaiting a decision.
Other technologies in Mid Devon
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.