Battery storage planning in Wigan

Wigan has decided 3 battery storage schemes and approved 100% of them, taking a median of 12.6 months to decide. Consented capacity: 120 MW. 4 applications still awaiting a decision.

100%
Approved
3 granted · 0 refused
12.6 mo
Median decision
UK 6 mo
120 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (3 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Wigan compares

Against the 137 UK authorities with 5+ battery storage decisions, Wigan sits in the 73rd percentile for approval rate (8 points above the England average) and the 7th percentile for speed.

Decisions by year

35Approved — 1 (2019)119Approved — 1 (2022)122Approved — 1 (2025)125
Approved Refused

Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (7)

SchemeMWStatusDecided
Sandyforth Farm, Ashton Road - Battery Energy Storage
UKGEA · A/23/96568/MAJOR · 12.6 mo to decide
70Awaiting Construction2025-02-25
Whitehead Landfill Site, Lower Green Lane - Battery Storage
Whitehead Restoration Limited · PA/2024/0759
Application Submitted2024-09-05
Whitehead Landfill Site, Lower Green Lane - Battery Storage
Whitehead Restoration Limited · A/24/97074/MAJOR
Revised2024-04-03
Orrell Street Battery Energy Storage Facility
Enzygo Limited Environmental Consultants · A/23/95931/MAJOR
50Application Submitted2023-08-29
Atherton - Battery energy storage
FPC Electric Land Limited / Pulse Clean Energy · A/22/93181/FULL · 5.4 mo to decide
30Operational2022-07-29
Orrell Street Battery Energy Storage Facility
Enzygo · A/20/88858/MAJOR
Revised2020-03-12
Kilshaw Street
Capbal · A/17/84749/FULL · 16.3 mo to decide
20Planning Permission Expired2019-03-04

Does Wigan approve battery storage schemes?

Yes — of the 3 battery storage schemes Wigan has decided, 100% were approved (3 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Wigan?

The median time from application to decision is 12.6 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has Wigan consented?

120 MW has been consented across 3 approved schemes. A further 4 applications awaits a decision.

Other technologies in Wigan

Solar in WiganOnshore wind in Wigan

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.