Renewable planning › Battery storage › Peterborough
Battery storage planning in Peterborough
Peterborough has decided 9 battery storage schemes and approved 100% of them, taking a median of 3 months to decide. Consented capacity: 104 MW. 2 applications still awaiting a decision.
How Peterborough compares
Against the 137 UK authorities with 5+ battery storage decisions, Peterborough sits in the 73rd percentile for approval rate (8 points above the England average) and the 88th percentile for speed.
Decisions by year
Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.
Every recorded scheme (13)
| Scheme | MW | Status | Decided |
|---|---|---|---|
Rightwell West, Bretton - Micro Energy Storage AMP Clean Energy · 25/01266/FUL · 1.4 mo to decide | 0.2 | Awaiting Construction | 2025-11-20 |
Vicarage Farm - Energy Storage System AMP Clean Energy · 25/00839/FUL · 3 mo to decide | 0.2 | Awaiting Construction | 2025-10-08 |
Lincoln Road - Energy Storage System AMP Clean Energy · 25/00841/FUL · 3 mo to decide | 0.2 | Awaiting Construction | 2025-10-08 |
Dukesmead Road, Dukesmead Industrial Estate - Battery Storage System AMP Clean Energy · 25/00843/FUL · 2.6 mo to decide | 0.2 | Awaiting Construction | 2025-09-26 |
Rightwell West, Bretton - Micro Energy Storage AMP Clean Energy · 25/00842/FUL | 0.2 | Revised | 2025-09-09 |
Bringhurst, Orton Goldhay - Energy Storage System AMP Clean Energy · 25/00844/FUL | 0.2 | Application Withdrawn | 2025-09-04 |
Malice Farm, French Drove - BESS FRV TH Powertek Limited · 25/01028/FUL | 49.9 | Application Submitted | 2025-08-12 |
Vicarage Farm - Energy Storage System AMP Clean Energy · 25/00840/FUL | 0.2 | Application Withdrawn | 2025-08-08 |
Inclusive, Titan Drive - Micro Energy storage facility Aggregated Micro Power Holdings Plc · 24/00937/FUL · 1.7 mo to decide | 0.2 | Awaiting Construction | 2024-09-09 |
Nutsgrove Farm, Thorney - Battery Energy Storage Cambridge Power Limited · 23/01746/FUL · 6 mo to decide | 50 | Awaiting Construction | 2024-06-28 |
Dogsthorpe, Welland Road - Solar Farm & Battery Storage Infinis Solar Developments Limited · 23/01579/FUL · 7 mo to decide | — | Awaiting Construction | 2024-06-21 |
Third Drove, Fengate - Battery Storage Flag Fen Power Limited · 22/00740/FUL · 6.7 mo to decide | 50 | Awaiting Construction | 2023-01-05 |
Wittering Ford Road Solar Charging (Lark Energy) · 19/01261/FUL · 1.8 mo to decide | 3 | Awaiting Construction | 2019-11-13 |
Does Peterborough approve battery storage schemes?
Yes — of the 9 battery storage schemes Peterborough has decided, 100% were approved (9 granted, 0 refused). The UK-wide rate for battery storage is 92%.
How long does a battery storage scheme application take in Peterborough?
The median time from application to decision is 3 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.
How much battery storage capacity has Peterborough consented?
104 MW has been consented across 9 approved schemes. A further 2 applications awaits a decision.
Other technologies in Peterborough
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.