Battery storage planning in Orkney Islands

Orkney Islands has decided 1 battery storage scheme and approved 100% of them. Consented capacity: 2 MW. 1 application still awaiting a decision.

100%
Approved
1 granted · 0 refused
Median decision
UK 6 mo
2 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (1 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Orkney Islands compares

Against the 137 UK authorities with 5+ battery storage decisions, Orkney Islands sits in the 73rd percentile for approval rate (8 points above the England average).

Every recorded scheme (2)

SchemeMWStatusDecided
Greentoft, Neven Point, Eday - Wind Turbines & BESS
Green Power (International) Limited · 25/203/TPPMAJ
10Application Submitted2025-06-23
Orkney Storage Park Project
Scottish Hydroelectric Power Distribution (SHEPD)
2Operational

Does Orkney Islands approve battery storage schemes?

Yes — of the 1 battery storage schemes Orkney Islands has decided, 100% were approved (1 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Orkney Islands?

There are not enough dated decisions in Orkney Islands to compute a median decision time for battery storage schemes.

How much battery storage capacity has Orkney Islands consented?

2 MW has been consented across 1 approved scheme. A further 1 application awaits a decision.

Other technologies in Orkney Islands

Solar in Orkney IslandsOnshore wind in Orkney Islands

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.