Battery storage planning in North West Leicestershire

North West Leicestershire has decided 4 battery storage schemes and approved 100% of them, taking a median of 14.8 months to decide. Consented capacity: 109 MW. 1 application still awaiting a decision.

100%
Approved
4 granted · 0 refused
14.8 mo
Median decision
UK 6 mo
109 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (4 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How North West Leicestershire compares

Against the 137 UK authorities with 5+ battery storage decisions, North West Leicestershire sits in the 73rd percentile for approval rate (8 points above the England average) and the 4th percentile for speed.

Decisions by year

35Approved — 1 (2025)125Approved — 1 (2026)126
Approved Refused

Battery storage decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (5)

SchemeMWStatusDecided
Remembrance Way - Battery Energy Storage System
Root Power South Limited · 24/01376/FULM · 14.1 mo to decide
99Awaiting Construction2026-01-08
Moto Donington Park - Solar Farm
Dunkin Rushton Limited / Moto Hospitality Limited · 23/01712/FULM · 15.6 mo to decide
Awaiting Construction2025-05-12
Charley Road - Solar Farm
Namene Solar · P/23/2029/2
Application Submitted2023-11-22
Beveridge Lane Battery Storage
Amazon UK Services / Push Energy · 18/01437/FULM
Planning Permission Expired2018-08-29
Hill Farm - Energy Barn
Anesco/ Green Hedge Energy UK · 16/00735/FUL
10Operational2016-06-22

Does North West Leicestershire approve battery storage schemes?

Yes — of the 4 battery storage schemes North West Leicestershire has decided, 100% were approved (4 granted, 0 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in North West Leicestershire?

The median time from application to decision is 14.8 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has North West Leicestershire consented?

109 MW has been consented across 4 approved schemes. A further 1 application awaits a decision.

Other technologies in North West Leicestershire

Solar in North West LeicestershireOnshore wind in North West Leicestershire

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.