Battery storage planning in Middlesbrough

Middlesbrough has decided 4 battery storage schemes and approved 50% of them, taking a median of 8.1 months to decide. 1 application still awaiting a decision.

50%
Approved
2 granted · 2 refused
8.1 mo
Median decision
UK 6 mo
0 MW
Consented
across approved schemes
1
Appeals
1 allowed on appeal

⚠️ Small caseload (4 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Middlesbrough compares

Against the 137 UK authorities with 5+ battery storage decisions, Middlesbrough sits in the 1st percentile for approval rate (42 points below the England average) and the 24th percentile for speed.

Every recorded scheme (6)

SchemeMWStatusDecided
The North West & South East Sides Of The A19 - Energy Storage Facility
AMP Clean Energy · 24/0382/FUL · 14 mo to decide
0.2Awaiting Construction2025-11-25
Marton Road - Micro Energy Storage Facility
AMP Clean Energy · 25/0401/FUL · 1.9 mo to decide
0.2Application Refused2025-10-06
The Vale - Micro Energy Storage Facility
AMP Clean Energy · 24/0386/FUL · 8.1 mo to decide
0.2Application Refused2025-05-30
Marton Road - Micro Energy Storage Facility
AMP Clean Energy · 24/0385/FUL · 8.1 mo to decide
0.2Revised2025-05-30
Riverside Park Industrial Estate - Battery Energy Storage
AMP Clean Energy · 24/0384/FUL · 7.9 mo to decide
0.2Awaiting Construction2025-05-23
Stainton Way - Micro Energy storage
AMP Clean Energy · 24/0383/FUL
0.2Application Withdrawn2025-04-23

Does Middlesbrough approve battery storage schemes?

Yes — of the 4 battery storage schemes Middlesbrough has decided, 50% were approved (2 granted, 2 refused). The UK-wide rate for battery storage is 92%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a battery storage scheme application take in Middlesbrough?

The median time from application to decision is 8.1 months, against a UK median of 6 months for battery storage. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much battery storage capacity has Middlesbrough consented?

0 MW has been consented across 2 approved schemes. A further 1 application awaits a decision.

Other technologies in Middlesbrough

Solar in MiddlesbroughOnshore wind in Middlesbrough

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.